Announcements about Gulf charging networks are plentiful, but reading them together reveals a clear gap between the figures that exist and the targets announced.
What exists today: about sixty EVIQ stations in Saudi Arabia, more than 2,200 charge points in Dubai, and one ADNOC hub with sixty plugs on the E11.
What is announced for 2030: five thousand chargers across a thousand sites from EVIQ, seventy thousand charge points from E2GO, and a Saudi government target of thirty thousand stations.
Gulf charging networks — figures and targets
| # | Operator | Today | Target |
|---|---|---|---|
| 1 | E2GO — Abu Dhabi | — | 70,000 points by 2030 |
| 2 | EVIQ — Saudi Arabia | 60 stations | 5,000 chargers across 1,000 sites by 2030 |
| 3 | ADNOC Distribution | One hub with 60 plugs | 20 hubs by 2027 |
| 4 | Dubai | 2,200+ charge points | — |
| 5 | Saudi Arabia — government target | — | 30,000 stations |
ADNOC’s hub at Seih Shuaib on the E11 between Abu Dhabi and Dubai charges most cars from zero to 80% in about twenty minutes, and 15 of the 20 hubs are expected to be operating by the end of 2026. — Source ↗
Most of the infrastructure that will serve electric cars in the Gulf has not been built yet — a description of a stage, not a criticism.
The distance between the two sets of figures means most of the infrastructure that will serve electric cars in the Gulf has not been built yet — which is a description of a stage rather than a criticism.
The question a buyer should ask today is not about 2030 figures but about 2027: how many charge points will be available within five kilometres of my home during my ownership period? And that is answered by local deployment plans rather than national targets.



